Equipment coordination
Coordinating operating sequences and interfaces between PLCs, robots and drives.
Discuss your project ↗04 / SYSTEM INTEGRATION
We connect PLCs, robots, drives and operational data. Alongside control interfaces, we develop Windows-based data acquisition, diagnostics and reporting applications as part of system integration.
01 / THE TASK
When integrating new equipment, modifying an existing production line or processing operational data, we first clarify the connected systems and their roles. We plan development around the available interfaces and the agreed operation.
Coordinating operating sequences and interfaces between PLCs, robots and drives.
Defining the path of required status information, commands and operational data from source to use.
Developing Windows-based data acquisition, diagnostics and reporting applications as part of system integration.
02 / WORKING TOGETHER
Reviewing equipment, existing software and the boundaries of responsibility.
Defining data, signal handshakes and operating conditions.
Implementing control interfaces and the required industrial applications.
Checking the connected components and data flows together.
Documenting interfaces, software and the agreed operating guidance.
03 / HANDOVER
We define the exact handover scope at the start of the project, tailored to the task.
We hand over documentation of the implemented interfaces, signal handshakes and data flows, together with the agreed program and application files. For industrial software development, the package also includes installation, configuration and operating guidance, along with the system test results.
The documentation explains which equipment sends which data, where the information goes and under what conditions the connection operates. This helps locate communication faults, reinstall applications and add new equipment or data sources later.
04 / INITIAL DISCUSSION
05 / FREQUENTLY ASKED QUESTIONS
We develop Windows-based data acquisition, diagnostics and reporting applications as part of system integration. These process equipment data to meet operational needs.
We assess the options by reviewing the existing control system, available interfaces and program sections that can be modified. We then define the scope of the work.
We select the specific data based on the information made available by the equipment and its intended use. We agree on display, storage and report content at the start of the project.
After checking the interfaces, we carry out joint system tests using the agreed operating scenarios. We define the test environment and acceptance criteria in advance.
06 / CONTACT
Tell us which equipment and data you want to connect.